HECToR Quarterly Report, 1/10/2010 - 1/1/2011
The report is presented in three parts.
- A report for the Phase 2a system
generated by SAFE, the systems administration
software. This includes:
- Time usage, broken down by project and by queue;
- Slowdown figures;
- Disk usage, broken down by project;
- Helpdesk activity.
- A report for the Phase 2b system (non-contractual service)
generated by SAFE, the systems administration
software. This includes:
- Time usage, broken down by project and by queue;
- Slowdown figures;
- Disk usage, broken down by project;
- Helpdesk activity.
- A summary provided by HECToR staff. This includes:
- System availability, including incidents, failures, MTBF and serviceability;
- Overall utilisation
- Performance metrics.
- Quality tokens set over the last three months;