HECToR Monthly Report, February 2011

Information on the utilisation, disk allocations, slowdowns and helpdesk statistics can be found in the associated SAFE monthly report.

From 1 February 2011, Phase 2b is the contracted service. This report relates to the Phase 2b service only. Performance statistics for the non-contractual Phase 2a system can be found here.

Dates covered: 08:00 1 February 2011 to 08:00 1 March 2011
Number of hours: 672

1: Availability

Scheduled down time: 16 hours 35 minutes.

Incidents

The following incidents were recorded:

SeverityNumber
12
20
312
40

Of the four severity levels, level 1 corresponds to a contractual failure.

Out of the 12 SEV-3 Incidents, 12 were attributed to single node failure events.

Details of severity level 1 incidents

ID Date Description Length Attribution
Incident-5776 20/02/2011 All LNET routers down 00:42 Cray
Incident-5806 26/02/2011 esFS failure - no access to /work 08:26 Cray

MTBF and Serviceability

AttributionFailuresMTBFUDTServiceability
Cray236609:0898.61%
Site000:00100%
External000:00100%
Other000:00100%
Overall236609:0898.61%
  • Note 1: Serviceability%= 100*(WCT-SDT-UDT)/(WCT-SDT)
  • Note 2: MTBF (Mean Time Between Failures) is defined as 732/Number of failures.

Details of single node failures

Error Type Number
Software error - kernel panic/heartbeat error 2
HT lockup 3
MCA bank 4 error (DIMMs) 3
Voltage fault 1
Nodes admin down 2
Nodes cold start 1

2: Courses

This information is supplied by NAG Ltd
Title of Course Dates Available Places Ordinary Attendees Paying Attendees CSE Staff Total Attending
Fortran 95, King's College London 16 - 18 February 2011 50 43 0 1 44
Advanced Computational Methods II (MSc), University of Southampton Every Thursday in February (1,8,15,22) 2011 20 18 0 0 18

3: Quality Tokens

Date Tokens Awarded Comment Consortium
01/02/2011 * * * * Four positive tokens. No comment from the user e05
23/02/2011 * * Two positive tokens. No comment from the user e10/e24

4: Hours Worked

GroupDays workedFTEs
USL70.84.0
OSG76.74.3

5: Performance Metrics

Technology Provision

Description TSL FSL Value
Technology reliability 85% 98.5% 98.6%
Technology throughput 7000 hours 8367 hours 8475 hours
Capability job completion rate 70% 90% 100%
Technology MTBF 100 hours 126.4 hours 366 hours

Note: Technology throughput is calculated: 12*(732-UDT-SDT), where 732 is the annual average number of hours in a month.

Note: MTBF is calculated as 732/number of failures

Service Provision

Description TSL FSL USL Value
Percentage of non-in-depth
queries resolved within one day
85% 97% 99% 99.4%
Number of SP FTEs 7.3 8.0 8.7 8.3
SP Serviceability 80% 99% 99.5% 100%