The HECToR Service is now closed and has been superceded by ARCHER.

HECToR Monthly Report, January 2010

Information on the utilisation, disk allocations, slowdowns and helpdesk statistics can be found in the associated SAFE monthly report.

Dates covered: 08:00 1 January 2010 to 08:00 1 February 2010
Number of hours: 744

1: Availability

Scheduled down time: 11 hours 50 minutes.

Incidents

The following incidents were recorded:

SeverityNumber
13
22
313
40

Of the four severity levels, level 1 corresponds to a contractual failure.

Out of the 13 SEV-3 Incidents, 13 were attributed to single node failures.

Details of severity level 1 incidents

ID Date Description Length Attribution
Incident-2777 12/01/2010 Module fault: c19-2c1s0 02:16 Cray
Incident-2787 20/01/2010 Maintenance session overrun 03:50 Cray
Incident-2827 25/01/2010 High Speed Network failure 05:24 Cray

MTBF and Serviceability

AttributionFailuresMTBFUDTServiceability
Cray324411:30:0098.4%
Site000:00:00100%
External000:00:00100%
Other000:00:00100%
Overall324411:30:0098.4%
  • Note 1: Serviceability%= 100*(WCT-SDT-UDT)/(WCT-SDT)
  • Note 2: MTBF (Mean Time Between Failures) is defined as 732/Number of failures.

Details of single node failures

Error Type Number
UME bk4 (Dimms) 2
UME bk 0-4 (Internal Opteron) 3
RX message header CRC Error 5
RX message CRC Error 1
RX packet sequence number error 2

2: Courses

This information is supplied by NAG Ltd
Title of Course Dates Available Places Ordinary Attendees Paying Attendees CSE Staff Total Attending
Parallel Programming with MPI, Imperial 4 - 6 January 2010 30 17 0 0 17
OpenMP, Imperial 7 - 8 January 2010 30 11 0 0 11
Best Practice in HPC Software Development 11 - 15 January 2010 14 6 0 0 6
Parallel Programming with MPI, University of Bath 26 - 28 January 2010 30 11 1 0 12

3: Quality Tokens

None set this month.

4: Hours Worked

GroupDays workedFTEs
USL65.43.7
OSG78.24.4

5: Performance Metrics

Technology Provision

Description TSL FSL Value
Technology reliability 85% 98.5% 98.4%
Technology throughput 7000 hours 8367 hours 8504 hours
Capability job completion rate 70% 90% 96.9%
Technology MTBF 100 hours 126.4 hours 244

Note: Technology throughput is calculated: 12*(732-UDT-SDT); 732 - annual average number of hours in a month

Note: MTBF is calculated as 732/number of failures

Service Provision

Description TSL FSL USL Value
Percentage of non-in-depth
queries resolved within one day
85% 97% 99% 100%
Number of SP FTEs 7.3 8.0 8.7 8.1
SP Serviceability 80% 99% 99.5% 100%