HECToR Monthly Report, Phase 2B system, December 2010

Information on the utilisation, disk allocations, slowdowns and helpdesk statistics can be found in the associated SAFE monthly report.

Dates covered: 08:00 1 December 2010 to 08:00 1 January 2011
Number of hours: 720

1: Availability

Scheduled down time: 267 hours 20 minutes. Note this includes extended scheduled downtime from 6 December until 17 December for the Gemini Upgrade.

Incidents

The following incidents were recorded:

SeverityNumber
10
20
323
40

There were no Phase 2b system failures in December. The Phase 2b system was impacted by Incident-5306 as reported against the contractual service.

MTBF and Serviceability

AttributionFailuresMTBFUDTServiceability
Cray000:00100%
Site000:00100%
External000:00100%
Other000:00100%
Overall000:00100%
  • Note 1: Serviceability%= 100*(WCT-SDT-UDT)/(WCT-SDT)
  • Note 2: MTBF (Mean Time Between Failures) is defined as 732/Number of failures.

2: Performance Statistics

Technology Provision

Description Value
Technology reliability 100%
Technology throughput 8784 hours
Capability job completion rate 100%
Technology MTBF

Note: Technology throughput is calculated: 12*(732-UDT-SDT); 732 - annual average number of hours in a month

Note: MTBF is calculated as 732/number of failures